It would be nice if invoice reversals were labeled as a reversal instead of a credit memo so during payment selections, invoices and the reversals can be selected together. Or if when an invoice is reversed, the invoice and reversal will automatically be put in payment history.
Company | Vigo Coal Company |
Job Title / Role | AP CLerk |
Dear Viewpoint Suggestion Box contributor;
We at Viewpoint sincerely thank you for your contribution to Suggestion Box on how we can improve Viewpoint products. While we can’t do everything at once, we rely upon your feedback to help guide the prioritization of our product improvements, and Suggestion Box is a critical tool for us to understand and prioritize our customers’ needs.
Viewpoint reviews Suggestion Box regularly for all of our products and updates statuses, adds comments, and performs various house-keeping (including deleting) as needed to ensure that Suggestion Box is maintained as a productive environment for product enhancements requests.
© 2023 Trimble Inc. All Rights Reserved. Viewpoint®, Vista™, Spectrum®, ProContractor™, Jobpac Connect™, Viewpoint Team™, Viewpoint Analytics™, Viewpoint Field View™, Viewpoint Estimating™, Viewpoint For Projects™, Viewpoint HR Management™, Viewpoint Field Management™, Viewpoint Financial Controls™, Vista Field Service™, Spectrum Service Tech™, ViewpointOne™, ProjectSight® and Trimble Construction One™ are trademarks or registered trademarks of Trimble Inc. or its affiliates in the United States and other countries. Other names and brands may be claimed as the property of others.
Yes this definitely should be fixed, considering that's what the help section suggests that it should be doing already when reversing an invoice.
Hi Geoffrey,
In order to process a credit the entire invoice has to be reversed and then edited and then rebilled. It would be nice to be able to create a credit against an invoice without having to go through all the steps of the reversal. I hope this makes more sense for you.
Thank you,
Jennifer Sanchez
Controller
Cascade Concrete Sawing & Drilling
Ph: 253-872-7578 Fax: 253-946-3783
PO Box 3618, Federal Way, WA 98063
www.Cascadeconcretesawing.com
This message (including any attachments) may contain confidential, proprietary, privileged and/or private information. The information is intended to be for the use of the individual or entity designated above. If you are not the intended recipient of this message, please notify the sender immediately, and delete the message and any attachments. Any disclosure, reproduction, distribution or other use of this message or any attachments by an individual or entity other than the intended recipient is prohibited
An invoice reversal is when you have posted an invoice into the system & then (for whatever reason) reverse it out of the system. For example, the invoice was posted to the wrong vendor or possibly posted in the wrong company.
A credit memo is an actual credit memo received from a vendor ��� most likely for the return of items previously purchases.
Aimee Lochowitz, CPA
Controller
520-548-5919
[cid:image001.jpg@01D5DCF5.248AEBC0]
[cid:image002.png@01D5DCF5.248AEBC0]
--- NOTICE ---
This message is for the designated recipient only and may contain confidential, privileged or proprietary information. None of the contents of this message or attachments can be used or shared without written permission from FHI Plant Services Inc. If you have received it in error, please notify the sender immediately and delete the original and any copy or printout. Unintended recipients are prohibited from making any other use of this e-mail. Although we have taken reasonable precautions to ensure no viruses are present in this e-mail, we accept no liability for any loss or damage arising from the use of this e-mail or attachments, or for any delay or errors or omissions in the contents which result from e-mail transmission.
Just wanted to correct something in my previous comment. Our AP has advised that the original invoice and the reversal are now moving to history with an R cheque number. So evidently this has been fixed in the system. However the system still uses 'Credit" for both types of Credit Memos. No distinction in the type field.
There are two types of credits labeled as Credit Memo in the system 1) an 'internal' invoice reversal done to correct GL coding / Job Coding / entry error and 2) an 'external' Credit Memo issued by a Vendor.
With both being called Credit Memo, it can be difficult to distinguish between them duirng payment processing. No one likes to show the original invoice /reversals on check stubs unless the error was the vendor's.
The ideal situation would be the second suggestion of immediately removing the original invoice and the reversal with the same number from the open items and moving them to payment history. In that way only a replacement invoice is in open items to be selected for payment.
Forgive me here, but I am not getting the difference between an invoice reversal and a credit memo. What am I missing?
To me they seem the same, so I am obviously missing something here. Thanks for the explanation!